Blob the Builder

By Blobinski

The Upsteppers

270 concrete blocks, 1 tonne of sand and 7 bags of cement used and the walls are complete. As Gerry laid the blocks, I was able to complete the underground drainage which will link my door threshold drain and patio slot drain to the rainwater drain system.
All now ready for backfilling with a serious amount of suitable material, yet to be sourced...

Comments
Sign in or get an account to comment.