Abstract flower (Day 2309)

I spent the morning at the bathroom re-fit doing the wetwall around the bath. It is a job I don't really enjoy doing, and today it was made worse by the swarm of midges that attacked me whilst I was outside cutting the sheets of wetwall.
The afternoon was spent fitting the bath taps and connecting them to the supplies and connecting the bath to the waste. It would have been a great deal easier to fit the taps before I fitted the bath, but it would have made fitting the wet wall much more difficult.
Back home to catch up on the adventures of my beautiful wife who appears to have acquired another hoss...

Comments
Sign in or get an account to comment.