Abstract (Day 2307)

After the morning wander up the hill with Sigyn, I made my way to town to make a start on a bathroom re-fit.
This job has been on the cards for a fair while and there has been a fair bit of messaging between the customer and me to sort out various aspects of what is to happen with the room, so it is nice to finally make a start. Not so nice has been finding out that the existing bath was cut into the walls at either end, because the space isn't big enough for a full size bath. Worse still there is a fair bit of water damage to the floor and walls. All the damaged wood needs to be removed and replaced. By the time I finished up for the day, the old bath was stripped out and I had replaced a bit of flooring. I am two days behind on the bathroom re-fit already.
Back home with no pictures I resorted to a snap of my beautiful wife's vase of flowers. 

Comments
Sign in or get an account to comment.