Lyde (Day 2300)

Back to the bathroom re-fit this morning, and I spent a while sorting out the new towel rail and changing one of the control valves on the heating. Clearly, whoever fitted the central heating gave no thought to future maintenance when they did their install. A job which should have taken half an hour took near enough three times that.
I zoomed home for lunch and to get Sigyn out for a walk in the sunshine at Lyde, meeting  my beautiful wife briefly as she popped home from work to collect something.
I had a trip out to Stromness later to sort out a loo, then headed back home to get the grass cut.

Comments
Sign in or get an account to comment.