This was a very wet and stressful site day. We had to take measurements on the A82 trunk road and this can only be done safely under traffic management (TM). I had to hire in specialists to administer all the approach signs and the TTLs. I was allowed 5 minutes spells at "all red" before having to stand aside to let the frustrated drivers pass through.

It actually all went very smoothly and the guys on the TM (G and D) worked very hard to make things go that way. They were soaked too.