Tanked Up!
All the board joints, and floor to wall junctions are now taped, and the whole area has received 2 coats of liquid membrane. Ready for floor tiling next. Quite a challenge as I need to get the correct fall running towards the shower drain!
173
views
- 0
- 0
- Samsung SM-A125F
- 1/33
- f/2.0
- 5mm
- 200
Comments
Sign in or get an account to comment.