Towel rail plumbed in this afternoon and tiling now complete, bit of a faff partially draining system and re pressurising but went sweet with no mess.

Happy that all is neat and in order with grouting to carry out tomorrow. Removed shower bar valves as wasn't quite on centre and I need things to be done right so around three hours labour today on that alone but much happier that things are spot on and pressure tested with no signs of as much as a drip which made me smile.

Heavy workload tomorrow to make up for lost time today but in no real rush and refuse to compromise on finishing details.

I have ordered some matt black pipe cover to cover my holes in tile...just to finish it off.