Moments in time

By Ali_tkdgirl

Oops

This driver was having a bad day. This road was originally scheduled to take 2 days to resurface, but when they started work they soon realised that it was going to take much longer. The original road was over 40 years old and only had 3 inches of tarmac over mud! Then yesterday the contractors accidentally damaged the water main. That was fixed last night. Then today a 20 ton truck full of asphalt drove up, over the repaired water main, in the already wet mud, and sunk up to its axle...... and damaged the water main again. I feel for the residents of the street.

Comments
Sign in or get an account to comment.