Pipe dreams...
Whilst we wait for the replacement newel post to arrive, it's back to plumbing the waste pipes for the bathroom. These all come down through the bathroom floor;shower, bath, basin, WC, and MVHR unit overflow. As the photo shows, they then run within the first floor void, maintaining a fall, to the soil stack. Good news, it's pretty much finished !
245
views
- 0
- 0
- Samsung SM-A750FN
- 1/25
- f/1.7
- 4mm
- 400
Comments
Sign in or get an account to comment.