Croft16

By Croft16

The Poly Tunnel.

Not a great picture, but work continues. Today I've placed the logs on the right hand side, these will be a retaining wall for 30 cm soil. The rail in the front is the eventual soil level, and level with the base of the post in the far left corner. That corner was about 3' higher than this end, and to get a level site have dug the topsoil out, removed the subsoil, and replaced 12" soil. I've just got the last 1/4 to dig, and level, before I start putting in the corner and intermediate posts. Overall size is 14 x 30 feet. The stones are French drains, dug down to bedrock, and backfilled with stone..

Comments
Sign in or get an account to comment.