Place: Centreville, VA 42/59
Main activity: Monday workers
Notes: Seems like the whole day was taken up by HVAC inspection (close to 3 hrs and added a shut-off) after waiting for him for awhile. Then another long wait until the plumbing inspector showed up - his inspection was pretty quick. Bed rails arrived and we put together and finally have a real bed in my room. Tired mostly and just baked some salmon for dinner and made mashed cauliflower and a side salad to go with.
35
views
- 0
- 0
- LM-G710VM
- 1/30
- f/1.6
- 4mm
- 200
Comments
Sign in or get an account to comment.