Progress is slow but steady

W put up 2 of the wall boards this morning- including bringing the wiring through and rewiring the sockets on the boards.

After this photo, we went for some lunch.  When W returned, the cut off switch for the shed had tripped.  W initially assumed it was something awry with his wiring work, but we subsequently isolated it to the lighting circuit, which was odd, as nothing has been done to that for several weeks.  We haven't tracked down the fault - no obvious problem with either of the overhead lights, so W carried on working using a spotlight - a job for another day - or if we fail to find an obvious problem, an electrician!

By the time he knocked off for the day (to watch the rugby at 4.45) we had put up the middle section of upper walling, and he had cut pieces for the lower walling.  

It's been too windy today to move more of the large sheets of OSB - hopefully we'll get a chance tomorrow, though it is forecast to rain.  We need to get them moved, so we can get the car back into the garage to charge it - I have a trip to Cambridge on Monday.  And also, so W can work on the walling whilst I am away for the day.

Comments
Sign in or get an account to comment.