Site meeting.
Piers finished and trough in place. Site meeting to discuss stand-pipe and taps. Enquiry from client as to hot water supply was dismissed as frivolous (ed: yes, it was intended as such). G was worried about the lack of verticality in the piers - even when pointed out that the same error would be a 'mere' 1 ft in a 40 storey high building.
64
views
- 0
- 0
- Motorola Moto G (5) Plus
- 1/2000
- f/1.7
- 4mm
- 64
Comments
Sign in or get an account to comment.