Teamwork
Jeff and his son worked together today to complete the last piece of trenching for water remediation. Fortunately there has been a spell of dry weather, allowing work on this project.
The next step is to lay a french drain in the trench and cover it with river rock. The final step is to create an arroyo or dry steam bed atop this trench for beautification.
The trenching machine made short work of the digging. Although they still had to dig out the loose soil by hand. Not surprisingly, Jeff was in bed before 8 pm!
Comments
Sign in or get an account to comment.