Silage!
Started making silage. We'll fill only one pit now, and leave the other one for the second cut as the yield is so poor. The first pit can't be filled very high as the wall between the pits can't hold that much pressure from one side any more. Despite the poor yield and one technical problem with the chopper, I managed to bring about 2/3 of the planned amount on the first day.
Here Jussi is driving the second load in with the miniloader. The end of the pit is below ground level, so the first loads must be put in with another machine before the tractor can come and go straight in and out.
Comments
Sign in or get an account to comment.