Fliss Fraser

By stripeyhat

Painting

Painting the upstairs guest to rooms now, the downstairs is a done with the exception of the new hatch in the hall ceiling. First guests arrive on 20th Feb so still have plenty of time to get finished and do a spring clean, dust from sanding plaster has gotten everywhere.
It snowed again this afternoon , wasn't expecting that, so Joss and I went out near dark for a quick go on the sledge. The snow could be gone by morning so we thought we should go for it.
Joss made a horse by balancing two stools on a skateboard and attaching a hobby horse to the front with sellotape. Ingenious as the stools didn't touch the floor so the horse actually moved. A stable was also made from two chopping boards, a third stool and an old suitcase.
Home made pizza for tea and a few dark chocolates left from Christmas and then more wool to play with, though discovered the point of my largest needles 12mm has snapped off, so will have to glue it back on in the morning.

Comments
Sign in or get an account to comment.