Master Mariner

By MasterMariner

Dolwin

Back on board of the Husky. First destination is the Thialf at the Dolwin windfarm location. The Thialf already installed a six legged jacket which will be the support for the Dolwin topside (installed later)
It is a large project (see this Link)
A sharp eye can see the tiny wind turbine supports left of the Thialf.
Power cables will run from these turbines to this convertor station and from here to the German shore.

Comments
Sign in or get an account to comment.