Pole to pole....

Well that will be the drought over then . It has rained non stop all day and is still chucking it down tonight.
A day spent mixing slurry now there is enough water going down the burn to be able to add water to it.
Also made a start building up the shearing shed after having to dig out the mower and baler to get at the pen floors which always seem to end up at the back .
Now back on grid as Scottish Power have finished all their maintainence work. This is one of the linesmen disconnecting the generator and replacing the main fuses in the pouring rain. Rather him than me !

Comments
Sign in or get an account to comment.