First set of bags done

Meant to make some of the last lego box this weekend with the boys, but shed stuff got in the way.

Have got rid of the old shed; via taking the bigger bits of wood to the tip, and hiding some of the smaller bits in the base of the extended rockery.

Two coats of paint on the remaining sheds, deck facing side.

Emptied the compost bin (onto the wood in the rockery), and moved it to where the old shed was.

All starting to take shape.

Not sure how much rockery stuff I'll do next week, as I've got a stall at a local craft market  - have I mentioned that yet ;)

But hopefully if I can sort out a new pump for the pond, and new length of piping, then I can start planning out the stream that is planned to go through the rockery into the pond.

Most nights this week are going to be taken up with the usual parenting commitments, plus working out what needs framing for next Saturday.

If you are around Bristol next Saturday, then the craft fair sounds like it could be worth a visit. Even if you don't want to see any of my prints, there are other stalls you may be interested.

Here's the facebook event with all the details

Oh, I almost forgot. This is the little lego pram, from the latest building set to be added to our street.

Probably going to take a long time to do, as the instructions booklet is huge (300 pages)

[edit]

And it would appear that nothing has changed since this time last year

Comments
Sign in or get an account to comment.