Da Daaa Main structure built

They worked on it yesterday until it was dark and we had to put the house lights on for them, but they finished it.  The electricians came first thing and wired up  so when the plasterer comes he will plaster over some of the wiring. the lads incorporated some of it into the roof so when its plastered the electricians will come back and put plugs and switches in and lights, and he's going to put my outside light back for me. I am going to get a new one like an old fashioned lamp.
The only other thing is that the rainwater pipe needs a Y to put two gutter downpipes into it, but its all in hand for next week. Next will be us laying the flooring (that will be a laugh) . Then the best bit choosing some furniture.
One problem was Tansy, who flatly refused to go into it, we had to take her out the front way and put her into the back garden through the big gates we keep locked. Anyhow I knew Mark and family were coming so I put her in the back with Molly and when they came she automatically came in with Molly through the conservatory doors to make a fuss of them, it seemed to do the trick and she has been going out since through it.
Grace and Autumn had a great time today playing in it.

Comments
Sign in or get an account to comment.