Finished!
I started this project over 6 weeks ago. It has taken a little longer than expected but we did go away for a week during that time.
I think you will agree that it is a slight improvement from this. Everything has been replaced. The whole room has been tanked to make a wetroom. The floor mounted toilet has been replaced by a hanging toilet with the cistern and piping totally concealed.
The extra shows the fitted basin unit which was totally made to measure by me.
I am already planning the next project which is to refurb the main bathroom before Christmas. That isn't such a big job however.