maureen482

By maureen482

Marlow Bridge.

Late on Saturday 24th September a 37 tonne lorry somehow managed to force its way over Marlow bridge, which has a 3 tonne limit. Repairs to Marlow bridge damaged by the heavy lorry could cost £200,000 and the bridge could be closed for up to six months. I did have two extra photos but I can't up load them for some reason. I hope you all have a good week end.

Comments
Sign in or get an account to comment.