The Loadout
A relatively simple & quick task ended up swallowing my whole morning. When I arrived onsite to supervise the load out, I discovered the supplier hadn't advised we needed a crane to lift one larger item. So there was a wait of nearly two hours on a rather drab day with plenty of time to have a yack with the truck driver.
The equipment, for my current well test project, is bound for a wellsite near Badgingarra (north of Perth).
108
views
- 0
- 0
- Apple iPhone 6s
- 1/417
- f/2.2
- 4mm
- 25
Comments
Sign in or get an account to comment.