Medoze

By SWodaem

Stone me

The stonework is nearing completion and does provide a good match with the existing (third bay in from the left). The cantilevered steelwork and joists have been aligned and cut and are now ready to take the sole plate for the timber framing above.
After water main and conc slab floor have been laid (over 150mm insulation board), the house walls at first floor level should fly up. .

Comments
Sign in or get an account to comment.