All in a days work

The cost of getting Fibre Optic cable laid in our town so we can get Ultra Fast BroadBand has come with some obstacles and problems. This is another cable strike, this time 4x 50mm Cable Ducts have been drilled smack bang through the middle of a 150mm Sewer Main. The only way we found this one was when we carried out a CCTV survey of the main.

Comments
Sign in or get an account to comment.