Cabin Progress
The metal roof is almost complete. All the windows are installed. The exterior doors are ready for hardware and paint. The deck is complete except for the railings and stairs. The electrical is done and ready for light fixtures. All the drywall has been installed and ready for paint. The guest bathroom has a tub.
This a view of the rear of the house. It's great when the vision matches reality and it does in this view. :)
There is so much left to be done with the builder now saying 8 weeks to completion.
Choices to be made are many and fast.
Flooring. Interior wood trim and stain. Kitchen and bathroom cabinets.
And closet organization.
All I wanted was a shelf and a pole but the builder is offering more shelves and a bench in the master closet.
I have to admit that my head hurts again.
I keep saying simple...