Master Mariner

By MasterMariner

Skirtpiles II

Tomorrow, the Thialf will move over to our mooring in order to pick up and stab the skirt piles one by one. As you can see, they're pretty long (400 ft +)
The will lift them with two cranes, upend them and finally stab them in the so-called skirt-sleeves. Drive them all the way into the seafloor and finally grout them to the jacket. It takes some effort before you can buy gas for your car.

Comments
Sign in or get an account to comment.