Heavy Transport
A34/A500 box junction at Talke in Staffordshire. There's a gated bridge through the centre of the traffic island which is strengthened to allow transformers to be moved up the A34 from Stafford where they're manufactured. The load weighed over 200t - gross weight - two tractor units, trailer and load - over 400t.
Comments
Sign in or get an account to comment.