Gas...
This is the gasskid of unit EC 7, ready to start.
In this bunch of pipes a heater is inplemented to heat the gas up to over 100°C (212°F) to make sure the conditions are right to use it in the burners of the gasturbine.
The heater is heated with steam.
Three units to start, at two of them we are performing a test to see if it's possible to decrease the start-up time.
After this shift I have a few days off; going to Terschelling for the weekend.
Here in LARGE....
Some remark: I used quite a long shuttertime with remote control, while the camera was standing on some industrial cleaner. The ISO was below 200, so I think that's the reason it does not show in the EXIF results