Gas... in HDR
Unit EC 20 is coming out of preservation.
She has to do jumptests as a performancetest for the grid (system) operator TenneT.
So: plenty work to do; takes about two weeks to get her ready.
This is a view at the second row burnermaifold (out of three).
Gasconsumption of the boiler at full load: 120000 cubic meters of natural gas per hour....
The unit looks a bit special when I process the pictures as HDR.
Here in LARGE....
Further on: problems at start-up on a High pressure steam valve of the HP turbine of unit EC 4, I had to call the maintenace technician on duty, always terrible for them because I'm completely awake when I call them and tell my problems and he is stumbling out of his warm bed....