meanderbestofem

By Meandertall

100 tonnes

That's how much gap 40 we had laid on the driveway in the last few days and me has the job of shaping, forming and rolling it with our wee tractor. Thought about blipping a piece of gravel but found the idea of making something of that too tiring and , nyaahhh. And Tazzie here is sympathizing with how I feel about the whole lot of it so that works.

It was a drop everything and get this job done kind of job. Glen from Carine was a hero coming in so quick with the gear and manpower and very accommodating of me trying to minimise the bill.

We also need a path built to the groomery to be and Glen said we can either wait 5 or 6 weeks , or do it tomorrow providing I help. Aaagh. Guess what the D was.

Comments
Sign in or get an account to comment.